Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9753611

- Product Categories
- Friendly Links
Information Name: | Supply Chengdu Chengdu CGM grout grouting material _ |
Published: | 2013-08-20 |
Validity: | 30 |
Specifications: | 50kg / Bag |
Quantity: | 99999.00 |
Price Description: | |
Detailed Product Description: | Supply Chengdu Chengdu CGM grouting material _ grout Dear customers and friends hello: when buying grout! Please look An Jianhong industry (elected me Atkins, needed peace of mind you). Our company is a set of product development, production, sales, technology provides the Group's building materials company, in: Chengdu, Beijing, Wuhan, Kunming, Hefei, Dalian, Tianjin and other places have established branch can conveniently shipped. 24 hours a day to serve you Olivia Cheng: 18683727886 seats Manager Contact: President Manager Tel: 18683727886 welcome to call us, all kinds of grout reinforcement, factory direct! Supply Chengdu Chengdu CGM grouting material _ grout! The product has a reliable quality, reduce costs, shorten the construction period, and ease of use. Fundamentally change the force equipment base, so that uniform to bear all the load equipment to meet a variety of mechanical and electrical equipment (heavy equipment precision grinding machines) installation requirements, is no ideal age pad installed grout. Supply Chengdu Chengdu CGM grout grout _ ☆ Features 1. High strength, early strength :1-3 days compressive strength of up to 30-50Mpa more. 2. Gravity high: You can fill all the gaps, to meet the requirements of secondary grouting equipment. Scene just add water and stir, pour directly equipment foundation, mortar gravity, vibration-free construction. Ensure that no vibration, long-distance grouting. Supply of Chengdu, Chengdu grouting material _ CGM grouting material 3. Micro-expansion: to ensure close contact between the equipment and infrastructure, secondary grouting contraction. 4. Durability: a million times fatigue test, 50 freeze-thaw cycle experiment no significant change. 30 days immersed in the oil intensity has improved significantly. 5. Winter construction can, good weather resistance: Allow the-10C temperatures for outdoor construction. 6. Low-alkali corrosion: strict control of raw materials, alkali content, suitable for alkali inhibit requirements of the project. ☆ Product use one. For machine base, foundation grouting anchor bolts and other equipment and steel structures (rail, steel, steel columns, etc.) is fixedly connected with the base of the secondary grouting. 2. Can be subways, tunnels, underground projects such as construction joints against the play embedment. 3. Building beams, plates, columns, foundation, floor and road reinforcement, repair and reinforcement. 4. Can be anchor bolts and steel and structural reinforcement. ☆ construction technology, supply grout _ Chengdu Chengdu CGM grouting material 1. Surface cleaning equipment foundation foundation treatment, no gravel, laitance, dust, grease and mold release agents and other debris. Before grouting 24h, equipment foundation surface should be sufficiently moist. Before grouting 1h, should suck water. 2. Grouting under way to determine the actual situation of the equipment base, select the appropriate grouting method can be "dead weight method grout" high funnel filling "or" pressure grouting method "grouting to ensure that the slurry can fully fill every corner. 3 . formwork determined according to the grouting and grouting Figure branch set up a template, the template positioning equipment base elevation should be higher than the upper surface of at least 50mm, template must support set tight, secure, prevent loosening, leakage of plasma 4. grout mix Press the grout for 12% -14% by weight of the amount of water mixing with water, the water temperature to 5 ~ 40 ℃ appropriate. using mechanical stirring time is generally 1 to 2 minutes; using artificial agitation advised to add 2/3 of the water was stirred for 2 minutes, after adding the remaining water and stirring was continued until homogeneous. 5. filling (1) from the side of the slurry poured into the other side until it overflows, the device base in order to facilitate the discharge of air between the concrete foundation, the grout, not from the four sides of the grouting. (2) should not be vibrated during the grouting process, if necessary, can be used for pulling the bamboo strips diversion. (3) in the grouting process until the release, should be avoided grout layer subjected to vibration and impact, so as not to damage the outstanding hard grout layer 6, the conservation (1) within 30 minutes after grouting, curing compound immediately or cover and affix the plastic film such as rockwool for conservation, or Immediately after the final setting grout layer watering moisture conservation. (2) winter construction, conservation measures should also comply with the current "reinforced concrete construction and acceptance norms" (GB50204) the relevant provisions. (3) at different temperatures and under the conditions of curing time Chaimo schedule daily minimum temperature (℃) removal time (h) curing time (d) -10 ~ 0 96 14 0 ~ 5 72 10 5 ~ 15 48 7 ≥ 15 24 7 ☆ Dosage: Dosage calculations to 2.28 -2.4 tons / cubic meter as the basis to calculate the actual usage of grouting material supply in Chengdu Chengdu CGM grouting material _ |
Admin>>>
You are the 5219 visitor
Copyright © GuangDong ICP No. 10089450, An Jianhong Yun Technology Co., Ltd. Chengdu All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5219 visitor
Copyright © GuangDong ICP No. 10089450, An Jianhong Yun Technology Co., Ltd. Chengdu All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility