Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9753611

- Product Categories
- Friendly Links
Information Name: | _ Yellowstone Yellowstone CGM CGM grout grouting material manufacturers |
Published: | 2013-08-27 |
Validity: | 30 |
Specifications: | 50kg / Bag |
Quantity: | 999999.00 |
Price Description: | |
Detailed Product Description: | _ Yellowstone Yellowstone CGM CGM grout grouting material manufacturers Yun Technology Co., Ltd. Chengdu An Jianhong An Jianhong industry directly under the Beijing Science and Technology Co., Ltd. is a research and development, production, sales, technical services as one of the specialized building materials company. "Only the right, is the best", the company not only to provide you with quality products, but also according to your actual needs, free to deploy products and provide ongoing technical support. "Atkins by me peace of mind to have you," You have chosen Atkins, is to choose the security and peace of mind. Company: Chengdu, Beijing, Wuhan, Kunming, Hefei, Dalian, Tianjin and other places have established branch can conveniently shipped. 24 hours a day to serve you Olivia Cheng: 18683727886 seats manager grout _ Yellowstone Yellowstone CGM CGM grout grout manufacturers use: 1, 2 secondary grouting equipment installation, steel column base installation 3, various machinery electrical equipment without pad Rail mounted mobile grouting 4, anchor bolts batholith column base grouting grouting 5, anchoring frame structure joints, bridge joints reinforcement 6, grouting post-tensioned precast, prestressed bridge pouring 7, concrete slab wall column co-transformation based reinforcement and repair instructions for use: 1, you need to clear the base surface grout dust, grease and other dirt and other substances are not conducive to bonding, the base surface application of water to wet to saturation, but the construction should not be left out of water. 2, products manufactured in strict accordance with the amount of water on the certificate mixing with water, stirring time is 4-5min. Water should be used within 30 minutes after. 3, should be added after pouring plastic film covering, Perturbations within 12 hours of non-relevant parts. 4 Stir the grout grout poured parts from one direction. If necessary, drill rod with bamboo strips or diversion may be appropriate to gently tap the template. 5, the construction should be immediately after curing agents sprayed or covered plastic film and affix straws or wet curing blankets 3-7 days. 6, is strictly prohibited in the grouting compound mixed with any additives or admixtures. Experimental indicators: (common equipment grout dedicated) Model initial setting (h) Final setting (h) Fluidity (h) Compressive strength (MPa) one day vertical expansion (%) reinforced bond strength (round) (MPa) Features 1d 3d 28d CGM-1 ≥ 2 ≤ 10 ≥ 280 ≥ 22 ≥ 40 ≥ 70 ≥ 0.02 ≥ 8.0 no bleeding, no embroidery corrosion of reinforced technical characteristics: early strength, high strength, high fluidity (gravity), no shrinkage, anti-oil seepage 1, early strength, high strength: more than one day strength up to 30MPa, equipment installed after a day to run the production. 2, gravity state: the scene just after mixing with water, equipment foundations poured directly without vibrating device can be based on all the gaps filled. 3, micro-expansion: in order to ensure close contact between the equipment and infrastructure. 4, no rust effect: steel, steel and other non-corrosion hazards. 5, anti-oil seepage: 30 days immersed in the oil immersion oil before its intensity ratio increased by 10% or more. 6, Endurance: 2,000,000 times fatigue test, 50 freeze-thaw cycle experiment no significant change. 7, good weather resistance -40 ℃ ~ 600 ℃ long-term safe use. _ Yellowstone Yellowstone CGM CGM grout grouting material manufacturers Contact: President Manager Tel: 18683727886 Chengdu Railway 23rd Bureau construction (Chengdu-Kunming Railway) Chengdu Eastern Music Park (secondary grouting equipment foundation) Baju Chengdu Railway construction (light rail into the irrigation ) Pengzhou petrochemical base (basic secondary grouting equipment) Longquan FAW-Volkswagen (secondary grouting equipment foundation) Chengdu Everbright overpass (bridge bearing grout) Dujiangyan Lafarge cement plant (secondary grouting equipment foundation) Ninth China Metallurgical, twelve MCC, etc. (steel base fixedly connected secondary grouting) Guangyu Guizhou Cement Co. (secondary grouting equipment foundation) Sichuan Road & Bridge Engineering Co., Ltd. (highway repair) Chengdu Foxconn (mechanical equipment foundation secondary grouting) Mianyang Strait (reinforcement) Construction Co., Ltd. (Mianyang Opera reinforced concrete beams, columns, increased cross-section) China Nuclear Industry Fifth Construction Co., Ltd. (secondary grouting equipment foundation) Sichuan Petrochemical Base (mechanical equipment foundation secondary grouting) fly in the aircraft industry to industry (group ) Co., Ltd., formerly known as "state-owned 132 Factory" (entrance high precision CNC machining center installed base of secondary grouting), etc. ...... _ Yellowstone Yellowstone CGM CGM grout grouting material manufacturers Company: Chengdu An Jianhong Yun Technology Co., Ltd. Tel: 18683727866 XI Manager E-mail: anjianhongyun@foxmail.com Address: Town, Wenjiang District Fair |
Admin>>>
You are the 5219 visitor
Copyright © GuangDong ICP No. 10089450, An Jianhong Yun Technology Co., Ltd. Chengdu All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5219 visitor
Copyright © GuangDong ICP No. 10089450, An Jianhong Yun Technology Co., Ltd. Chengdu All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility